Pay estimates
Pay estimates backed by measured quantities
Each period, EarthTally measures excavation and embankment from your flights against the design. The owner approves or rejects each line in the app, and every revision is kept.
How it works
- Fly at the end of the period. Your pilot uploads the flight as usual, and you check it against at least three surveyed points.
- EarthTally measures the period. Both flights are compared with the design surface, each corrected by its own accuracy check against surveyed points, giving the period's excavation and embankment. Each period starts where the last one ended, so ground already paid for isn't paid again.
- The owner reviews each line. They approve it, or reject it with a reason, in their own login. A decided line is locked.
- Revise and resubmit. A correction goes in as a new revision, decided afresh. The history stays, with the design, flights and checks each period was measured from.
Why measured quantities help
Quantity disputes slow payment down. When the owner can see the design, flights and accuracy checks each period was measured from, the conversation is about the ground, not about whose spreadsheet is right.
For owners
The owner gets their own login as the site's client. Each period shows up there with its lines to approve or reject, and the evidence under it.
Good to know
- Ground that changed by more than 3 m (about 10 ft) between the two flights is left out of a period's quantities, so on deep cuts or tall fills, keep periods short enough to stay under that.
- Pay estimate lines are quantities, not prices. Unit prices, retainage and change orders stay in your accounting or project system for now.
- The quantities are estimates from photogrammetry. Where a contract calls for surveyed quantities, they back up a pay application rather than replace the survey.